maxGEO secured a contract from Siemens Transmission and Distribution Ltd. to install and operate a time lapse camera during phase 3 of ElecLink Converter Station project at Eurotunnel Site at Longport (UK). The camera system replaced the robotic total station system (Topcon Delta Solution) and will document the construction progress during the next two years.
Mehr lesen
Über: admin@maxgeo.at
Letzte Artikel von admin@maxgeo.at
maxGEO @ Senceive – GeoWAN Technology
maxGEO visited Senceive in London to get familiar with the new launched technology of GeoWAN™ and the new optical displacement sensor node. GeoWAN™ is Senceive´s new IoT wireless platform that builds upon the strengths of their existing proven FlatMesh™. With its extremely long range transmission capability of up to 15km and ability to transmit though…
Mehr lesen
maxGEO @ Future of Building 2018
maxGEO will exhibit at the international building conference "Future of Building" at the Austrian Federal Economic Chamber in Vienna on the 8th of May 2018. Learn about the latest technologies, share project ideas for sustainable construction and high-quality buildings, find new project partners, etc maxGEO will present the following topics at booth #49 in exhibition…
Mehr lesen
maxGEO – Installation of an online monitoring system at A10 intersection Pongau
[mp_row] [mp_span col="12"] maxGEO installed a Topcon Delta Monitoring Solution for Kostmann GmbH at intersection Pongau of A10 Highway in Salzburg Austria. A Topcon MS1AX is monitoring a 20 m high and 250 m long anchor wall during refurbishment works in real time. maxGEO installed more than 50 prism targets at several sections and levels along…
Mehr lesen
Letzte Kommentare von admin@maxgeo.at
Keine Kommentare von admin@maxgeo.at noch