Letzte Artikel von admin@maxgeo.at

Geotechnical Installation Works – ARGE Flughafentunnel Stuttgart (Germany)

  • 1
  • 3
  • 4
  • pfa_1_3_new

The "Airport connection - new line with NBS station" comprises the five-kilometer-long section of the new Stuttgart-Wendlingen-Ulm line along the A8 autobahn between the Filder Tunnel and the line to Wendlingen, the new long-distance and regional train station at the airport including the approaching tunnel, and the relocation of state road 1204.

maxGEO is supplying geotechnical instrumentation and wireless data acquisition systems as part fo the intensive monitoring works performed by GEODAT from Munich.

Recently load cells and wireless data acquisiton systems have been successfully installed.

 

maxGEO becomes GeoSLAM Dealer with Focus on Tunnel Application

We are happy to announce that we are GeoSLAM Distribution partner with focus on the use for 3D data collection of underground structures and tunnel applications.

With GeoSLAM´s go-anywhere 3D technology you can have safe and easy access to underground structures and operate with minimum interference with the tunnel excavation works.

As a result, tunnels can be faster and better constructed,, while being safer and considerably more cost efficient.

Soon we will share our first successful case study from a German tunnel site.

For more information contact us or check the new catalogue.

1 2 3

Letzte Kommentare von admin@maxgeo.at

Keine Kommentare von admin@maxgeo.at noch