maxGEO has secured the contract for instrumentation and monitoring during construction of the new converter station at Folkestone (UK). The converter station will be located within the perimeter of the Eurotunnel operational Channel Tunnel terminal as part of the Channel Tunnel Interconnector Project delivered by ElecLink. 400kV AC underground cables will connect the Converter Stations to…
Mehr lesen