Über: admin@maxgeo.at
Letzte Artikel von admin@maxgeo.at
New Contract secured from PORR Bau GmbH – River KAMP: Flood Defence Project
maxGEO secured the contract of vibration monitoring during construction of the flood defence project at river Kamp in Lower Austria. Works will start already in April 2017. maxGEO will use Syscom MR3000 instruments for real time monitoring of the piling works and maxGEO vision web monitoring platform to present the data.
Mehr lesen
New Contract secured from Züblin Spezialtiefbau – Folkestone Converter Station (UK) Instrumentation and Monitoring
maxGEO has secured the contract for instrumentation and monitoring during construction of the new converter station at Folkestone (UK). The converter station will be located within the perimeter of the Eurotunnel operational Channel Tunnel terminal as part of the Channel Tunnel Interconnector Project delivered by ElecLink. 400kV AC underground cables will connect the Converter Stations to…
Mehr lesen
New Contract secured from ASFiNAG (Austrian Highway Agency) – BL05 S36 Vibration Monitoring
maxGEO secured the contract of vibration monitoring during construction for the new section of S36 highway between St. Georgen and Scheifling in Styria. Works will start already in March 2017.
Mehr lesen
Letzte Kommentare von admin@maxgeo.at
Keine Kommentare von admin@maxgeo.at noch